You are using an outdated browser. To have the best experience use one of the following browsers:
Modernisation for the next generation.
Hiedl GbrAltusried (D)
Planning and part turnkey construction Venlo 6.000 m²
Planning and part turnkey construction
Venlo
6.000 m²
The new Venlo-construction was attached to the existing greenhouse. The 4 mm ESG roofing have reciprocal arranged ridge vents, which guarantee a maximum of air change. We provide also following services: application for planning permission with fire-prevention concept, bankings, foundations, loading ramps and the whole rainwater drainage system. We are particularly proud of the made-to-measure casting car, which allow a improvement of the operating procedures. (© Foto TASPO Projekte /Haymarket)
eMDAKlxA0k8